From foundation to ICF Superstructure in 12 weeks
The Gorey Nursing Home project in Conattin, Wexford is a fantastic example of how modern construction techniques can meet rising need for excellent nursing homes and sheltered accommodation. The 125-room nursing home, designed by Reddy Architecture + Urbanism is a 3-storey building covering 5,985 sqm built in Amvic ICF. Axis Construction are the main contractor on this nursing home project with the ICF work undertaken by Amvic’s approved installer Daly Construction.
The builders estimated that the Amvic ICF system allowed them to complete installation 60% faster than traditional blockwork. This remarkable speed was achieved by eliminating wet trades, typically a source of delays in masonry construction, minimising snagging, and ensuring no downtime due to weather. Additionally, the ICF system provided financial flexibility, with no upfront payments required for materials usually seen with timber frame projects.

Benefits of building Gorey Nursing Home in ICF
- Foundations to wall plate completed by week 12
- Walls immediately dry – ready for plaster boarding internally and externally for render
- No lintels or traditional cavity closing
- Single leaf construction – no cavity
- No labour issues
- Roof trusses installed in week 13
- Significantly reduced preliminary and scaffolding costs
- No lead times – ICF delivered to site within 48 hours
The finished structure showcased superb airtightness and thermal performance, significantly enhancing energy efficiency and reducing heating and cooling costs over the building’s lifetime. Furthermore, the system’s outstanding fire resistance ensures a high level of safety for future residents.
Gorey Nursing Home Design Team:
Gorey Nursing Home Build Team
- Developer: Amhola
- Contractor: Axis Construction
- Amvic Approved Installer: Paddy Daly of Daly Construction